Apr. 30th, 2009 02:15 pmThe front walk is done. Done enough, at least. the last row of stone wouldn't fit due to jagged concrete that couldn't be removed lest the front steps fall down. So I filled it with paver base, because FUCK IT.
I still need to put in the finishing sand, but that'll wait for dry weather. Also, it's unlevel, about a half-inch lower than it should be, and uneven. I like to call it "rustic", which implies that I meant to do it that way.
I'm hungry. Time for lunch!